Hon. Deborah Morris (Archive Site)
Garland City Council 2018-2024

Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024

Hon. Deborah Morris (Archive Site)
Garland City Council 2018-2024

Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024Hon. Deborah Morris (Archive Site) Garland City Council 2018-2024
  • Home
  • Deborah's Story
  • Accomplishments
  • Leadership & Crisis
  • Reviews
  • Talk to Me
  • News (Archived)
  • Shop
  • More
    • Home
    • Deborah's Story
    • Accomplishments
    • Leadership & Crisis
    • Reviews
    • Talk to Me
    • News (Archived)
    • Shop
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Deborah's Story
  • Accomplishments
  • Leadership & Crisis
  • Reviews
  • Talk to Me
  • News (Archived)
  • Shop

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

Rocky Roads in Garland

Two black birds standing on a concrete surface.

Feb 11, 2018 


Since announcing my candidacy for the Garland City Council last month and inviting citizens in District 2 to voice their top concerns and priorities, it’s been easy to identify the top two (loudest) concerns: 


1. Streets in bad repair 

2. The inadequacy and poor condition of the Garland animal shelter facility 


Today I will address where we are with streets, how we got here, and what we can expect going forward.   

Where We Are

As all of us in D2 can attest, we’re not in a good place with our streets. Deteriorated pavement, streets pitted with potholes despite being repeatedly filled with asphalt, broken alleys, you name it. I spent several hours Monday afternoon with Steve Oliver, Director of Garland’s Street Department. I told him that I have been barraged with citizen complaints about street conditions, and they’re demanding to know when their streets will be repaired. Mr. Oliver went over the specific repairs funded and scheduled for the next 3 years, which I will include here, but he also provided a figure that summed up the challenge rather neatly: the estimate to repair or replace all the Garland streets which are currently in bad repair would, today, cost $400 million and take 15-20 years to perform. 


It is, he said, “a big hill to climb.”   


The good news is, we as a City have at least started up that hill. Four years ago we had a street budget of $10 million; today it’s over $26 million and expected to keep climbing. Where we are now is not where we're going to stay. 

How Did We Get Here?

Before I go into the specific plans and approaches which I understand are currently in place to tackle our street problem, let’s take a step back to review how we got here. Rome wasn’t built in a day, and Garland streets didn’t deteriorate overnight.  


Here’s the big picture: most of Garland’s concrete streets were built in the 60’s and 70’s, with an expected lifespan of 30-50 years. Do the math. In many areas of the city, and particularly in the older sections in D2, we’re playing in overtime with our 50+ year old streets.  


So why didn’t our city leaders see this coming and start methodically replacing our oldest streets 10 years ago, before they completely failed?   


The answer is, at least partially, that we were hit with a “perfect storm”: the 2008 recession that caused a sudden and unexpected decline in tax revenue, necessitating an across-the-board tightening of budgetary belts, including street repair budgets; the 2010 drought which set a record as the driest year in Texas history and lingered for years, shrinking the clay soil under our streets and houses until many house foundations and streets cracked; followed by the wettest two years on record for Texas (2014-2016), which rapidly expanded the drought-parched clay soil and caused already distressed streets to buckle.   


These past 10 years haven’t been good to our streets in Garland.  

What We Can Expect

I’m afraid this will be one of those difficult “family discussions” where we’ll have to deal with both good news and bad. Buckle up.   


Let’s get the bad news out of the way first:  


1. There are no overnight solutions to a problem this big. It’s huge and it’s ugly. Yelling won’t make potholes disappear (although complaining CAN make a difference in some cases, which I’ll go into below), and repairs and replacements take time.   


2. Arterial streets (thoroughfares) will be given priority over residential streets since they carry much more traffic. If your residential street, like mine, is in bad shape but not impossible to drive on, you are likely going to get temporary fixes (i.e. asphalt patches, or if you’re lucky, an asphalt overlay) until we start catching up. There are exceptions, and a number of residential streets appear on the 2017-2019 Project List for reconstruction (replacement) rather than rehabilitation (cut-out concrete squares replaced with new concrete) or asphalt overlay.   


3. However, to my eye, D2 seems to be way under-represented on the project list. I’ve highlighted the few streets in our district so you can more easily check for your street(s). I plan to ask why D2 has only 20 streets on the project list of 222 projects. Street projects are supposed to be chosen based on the PCI (Pavement Condition Index), but I find it hard to fathom that D2 streets scored so close to D1 streets (northeast Garland, newest streets in the city). Stats and spreadsheets can be deceiving, but it’s enough to make me curious.   


So here’s the good news:  


1. We now have an impressive Street budget of over $26 million, and the budget is projected to keep growing over the next 10 years.  


2. The Street Department is in the process of hiring a Sr. Civil Engineer and a new inspector to speed things up. The PCI inspections are timed at 6, 9, 12, or 18-month intervals depending on their condition, with the worst streets being inspected more often. Take a look to find your street on the latest Street Inspection Report. 


3. Over the next quarter of the year, the Street Department estimates that they will perform 19.03 “lane miles” (a single lane one mile long) of street repair and rehab, 2.78 lane miles of alley repair and reconstruction, and 7.28 lane miles of asphalt overlays.   


Coming back to yelling about streets… one question I asked Steve Oliver was this: “Does it actually accomplish anything for citizens to call or email the City to complain about their streets?” I wondered, given that the PCI inspections seem to drive the selection process for repair or replacements.  


He answered frankly that, if 10 streets come back with the same (low) rating, “citizen outcry” acts as a sort of tie-breaker. Will badgering the City get your moderately-bad street prioritized over someone else’s street that looks like they’ve been bombed? No. But among equally bad streets, your complaints (get all your neighbors to call!) can push you to the top of that list. 


So do it! Call 972-205-3555, or email street@ci.garland.tx.us or visit Garland e-Assist. Or do all three. You know what they say about the squeaky wheel!  


I would love to promise that if you elect me, I will make YOUR street(s) come first. I can’t do that, but I CAN advocate strongly for more street $$ to be designated for D2. We are going to have to endure the process as we collectively dig our way out of the mess we’re in. But one thing I can promise you: barring more cataclysmic weather fluctuations or tornados, the City of Garland will look and ride very differently, and more beautifully, in 5 or 10 years.   


You can listen to Steve Oliver’s presentation to Council (Item 3A) here.

Show More

Political Ad Paid for by Deborah Morris  Campaign

  • Privacy Policy
  • Terms and Conditions

Powered by